    Most BC contractors build to minimum code. We build to last. Here's the technical difference — and why it matters for your property.

    Why Farrow Built

    Six Technical Advantages

    These aren't marketing claims. They're the specific construction decisions we make on every build — and the reason our buildings outlast the competition.

    Screw Pile Foundations

    Engineer-Specified

    No frost heave. No settling. No cracking.

    Every Farrow Built structure is anchored on engineered screw piles — helical steel shafts driven below the frost line. Unlike poured concrete pads that shift and crack with BC's freeze-thaw cycles, screw piles lock your building in place permanently. Our piles are geotechnically engineered: we don't guess at what the ground can support — we measure and engineer it.

    8-Foot Post Spacing

    Structural Standard

    Stronger frame. More wall options.

    We frame at 8-foot post spacing — stronger than a stud wall building and giving you more flexibility for window and door placement. It also means less thermal bridging: with a post every 8 feet instead of every 16 inches, there are far fewer conductive paths for heat to escape through the wall.

    R28 Insulation Package

    Energy Efficient

    No thermal bridging. Real energy performance.

    Our standard insulation package uses R28 batt insulation in the walls. With posts spaced 8 feet apart, there are far fewer framing members conducting cold through the wall compared to a stud wall building — and dramatically better insulation than a steel building. The result is a heated shop or barn that actually stays warm and energy bills that reflect it.

    Steel Cladding & Roofing

    40-Year Warranty

    Built for BC weather. Backed by warranty.

    Our steel cladding and roofing panels are rated for BC's wind and snow loads. Steel cladding is very low maintenance — it carries a 40-year warranty against fading and rust, and it's fire resistant. Colour-matched trim, proper flashing at every penetration, and a finish that holds up for decades.

    Engineered Drawings Included

    Permit Ready

    Permit-ready from day one.

    Engineered drawings are included when required. That means your permit application goes in with the documentation municipalities require — no back-and-forth, no delays waiting for a third-party engineer. We handle the paperwork so you can focus on planning your build.

    WorkSafeBC Registered

    Safety Certified

    Your project is covered. Your crew is protected.

    Farrow Built is WorkSafeBC registered and maintains active fall protection policies for every job site. Our employment agreements require fall protection compliance — not as a checkbox, but because it's the right way to run a crew.

    No Surprises

    How a Build Works, Start to Finish

    We've heard the horror stories — contractors who disappear, timelines that double, budgets that blow up. Here's exactly what working with Farrow Built looks like.

    01

    Phone Call

    We start with a phone call to learn about your project — what you want to build, where it is, and what you're trying to accomplish. Quick and straightforward.

    02

    Video Call or Office Visit

    Next is a more in-depth conversation — either on video or in our office. We gather the details we need, share information about how we build, and give you realistic pricing ranges for what you have in mind.

    03

    Design Package

    From there you can choose a design package — Base, Mid, or Top Tier — depending on your build and what's required. We sit down together (in office or on video) for the time included in your package and design the building with you. You're looking at it in 3D and seeing the live price the whole time. The full cost of your design package is credited toward your build.

    04

    10% Deposit & Engineering

    Once you've landed on the building you love at a price you love, a 10% deposit locks it in. From there it goes to engineering and we start the permit application.

    05

    Permits Approved — 70% Payment

    When permits are approved, a 70% progress payment brings your total to 80%. We guarantee a build start within six weeks. Material ships and our crew shows up on schedule.

    06

    Build & Final Walkthrough

    We build your structure. When it's done, we walk the finished project with you, you sign off on the result, and you make the final 20% payment. Your 10-year workmanship warranty starts the day you sign off.

    Ready to Get Started?

    The first step is a phone call. Tell us what you want to build and where — we'll take it from there.

    Start the Conversation